Our Construction Projects
A glimpse of few projects we have delivered recently.
Godrej Indiranagar, Compound wall and External development works
Client – Godrej Fund Management
PMC – Colliers
Value of contract – 93 lakhs
Scope of work – Excavation, blockwork, steel works, plastering, painting, concrete, MS works.
Misc Works at Brunton Central
Client : Indian City Properties Ltd. (Karam Chand Thapar Group)
PMC : Gleeds Consulting
Project : Miscellaneous finishing works – electrical, civil, interior & HVAC works. Scope of work includes granite finishes, counter top table, painting, HVAC, Glass door installation, façade lighting etc.
Cost : Rs. 15 Lakh
Duration : 45 days
Compound Wall Plastering & painting at NXT, Whitefield
Client : Brookfield Properties
PMC : Cushman & Wakefield (Facility Management)
Project : Dismantling of existing plaster and replastering and painting of compound wall for
the entire campus.
Cost : Rs. 12 Lakh
Duration : 35 days
Driveway Granite Installation – Ecoworld, ORR Bangalore – 16 Lakhs (2022)
Client : Brookfield Properties
PMC : JLL Consulting (Facility Management)
Project : Installation of Driveway granite, including surface preparation and RCC.
Cost : Rs. 16 Lakh
Duration : 30 days
Paver installation – Ecoworld, ORR Bangalore – 30 Lakhs (2021)
Client : Brookfield Properties
PMC : JLL Consulting (Facility Management)
Project : Paver installation at various locations in Ecoworld.
Cost : Rs.30 Lakh
Duration : 60 days
Waterproofing and civil works, KCT Brunton Road – 20 Lakhs (2021)
Client : Indian City Properties Ltd. (Karam Chand Thapar Group)
PMC : Colliers International /Gleeds Consulting
Project : Miscellaneous waterproofing and civil works, including construction of skin wall, concreting the surface with weld mesh, waterproof coating (Penetron)
Cost : Rs. 23 Lakh
Duration : 45 days
Compound Wall construction, (with granite cladding) NXT, EPIP Zone, Whitefield - 30 lakhs (2021)
Client : Brookfield Properties
PMC : Cushman & Wakefield (Facility Management)
Project : Dismantling of damaged compound wall, laying the footing with RCC, blockwork, plastering, lighting fixtures, granite cladding (front and back), MS grill work
Cost : Rs. 31 Lakh
Duration : 60 days
Compound Wall construction, (with granite cladding) NXT, EPIP Zone, Whitefield - 30 lakhs (2021)
Client : Brookfield Properties
PMC : JLL (Facility Management)
Project : Dismantling of existing paver blocks on the driveway, surface preparation and installation of M-40 grade paver blocks (rectangular).
Cost : Rs. 19.4 Lakh
Duration : 45 days